23-02-2017 Precast Concrete Floor going in Bay Grid 1 to 2 (closest to the 1st team pitch). Consists of 225mm Precast Concrete Beams (an inverted T section) Blockwork in fill between with 75mm insulation on top and 75mm reinforced Concrete Screed
23-02-2017 Precast Concrete Floor going in Bay Grid 1 to 2 (closest to the 1st team pitch). Consists of 225mm Precast Concrete Beams (an inverted T section) Blockwork in fill between with 75mm insulation on top and 75mm reinforced Concrete Screed